Case Studies

Recent Projects

Here is a small selection of recent project that DAPS has worked on, we may be involved for a small part of projects or be the management team for the entirety of the project. We aim to be a flexible to fulfil our clients needs

  • Project Management of Conservation building repairs and platform works at Bury St Edmunds Grade II listed Building.

    DAPS were commissioned by H.A.Marks to provide a full project management service for the refurbishment of the grade II listed station building and platforms at Bury St Edmunds. The station was formally inaugurated in 1847, the station building is red brick with stone dressings Designed by Sancton Wood (the architect also of Ipswich and Cambridge […]

  • Underpinning of Grade II listed Facade at Farringdon Station

    The works were undertaken to support the main Station Façade to Farringdon Station for Network Rail as part of the Thameslink upgrade project. Farringdon is one of the oldest underground stations in London being originally opened in 1863 as the Terminus to the Metropolitan railway, the first underground railway in the world. Existing cast iron […]

  • Cannon Street Advanced Works Premises Package

    DAPS provided project management support for Henny Ltd related to works at Cannon Street Underground Station which involved the modernisation of existing premises assets. DAPS provided project programming alongside QA and Health and Safety advice in the highly regulated environment of London Underground Limited (LUL). Client Henny Ltd. Dates during which the services were carried […]

  • Newbury Park Station Step Free Access Design and Build

    Newbury Park Step Free Access was a design and build scheme to install new lifts to Platforms 1 and 2 connected via high level walkways to the existing station overbridge. A new Station Control Facility was also provided as part of the scheme. Client  Birse Metro (click for website) Dates during which the services were carried […]

  • Tender Planning for London Underground Planned Maintenance Frameworks

    DAPS provided tender planning support to KN Networks Services since September 2011. DAPS produce tender programmes, methodology, risk registers and technical documents for design and build tenders for London Underground Planned Maintenance Frameworks and other stand alone tenders. Client  KN Network Services (click for website) Dates during which the services were carried out September 2011 to […]

  • Commercial management Specialist Demolition Works Manchester Town Hall Extension.

    DAPS provided commercial management support to Robore Cuts Ltd at Manchester Town Hall from September 2011 to October 2012. Robore are carrying out specialist saw cutting and demolition works on a Grade II listed public building as part of a major refurbishment project carried out by Laing O’Rourke. Robore use specialist plant such as robotic […]